In case of mismatch between the inward and outward details, the supplier would be required to rectify the mis-match within a period of two months and if the mis-match continues, the ITC would have to be reversed by the recipient.
Search for answers to your questions by entering keywords below, or look through our knowledge base.
In case of mismatch between the inward and outward details, the supplier would be required to rectify the mis-match within a period of two months and if the mis-match continues, the ITC would have to be reversed by the recipient.
Comments